Grúas y Maniobras de Precisión Precision has a long time experience in the construction and transportation sectors. This company has erected all the bridges in Ciudad Juarez including all three international bridges. Some of our clients include BCH de Juárez, DyM de Juárez, Teporaca y Santa Rosalia de Chihuahua.
AFollowing are some of the company’s most successful cases.
Maquiladora Lexmark in Ciudad Juárez, Chihuahua
Clients: Lintel, FLUTEC, MexTICA, Sánchez y Assoc.
The company has performed various projects at this industrial plant including heavy and light machinery lifts and rigging jobs inside the plant. The company erected 100% of all pre-fab concrete tilt-up walls including a 65 ton tilt-up for Lintel. Machinery lifts including AC units, chillers, evaporative coolers, dust collectors and specialized machinery for FLUTEC and MexTICA. Rigging jobs for specialized machinery inside the plant for Sanchez y Assoc. and the gantries were used to lift AC units inside the plant for FLUTEC.
Erection of 160 concrete beams weighting between 90 to 180 metric tons using various cranes including our Liebher crane and our P & H 140 tons crnae. This is one of Mexico’s biggest Distribution Circuits and the 180 ton beams are the heaviest the company has ever lifted.
Proyecto Distribuidor Vial Zaragoza, México, D.F.
2 structural cranes lifting a 140 ton beam January 2004 to October 2004
Projects done with the Federal Comission of Electricity
The company has done various projects with CFE. One of the company’s biggest job was the relocation of a turbogas power plant from the city of Chiuahua to Ciudad del Carmen, Tabasco. The job including loading, transporting, unloading and placing the components in its final resting position. Other projects include unloading transformers and placing transmission towers.
Bridge Projects
Juarez Porvenir and Libramiento Bridge
Marzo 2006 Liebher crane and P&H 140 ton crane lifting a 63 ton concrete beam.